Skip to content

EUDR Deadline: Your 6-Week Plan to 30 December

Raahul Dutta20 November 20265 min read
An aerial view of green forest and brown mountains.
Photo by Danny de Groot on Unsplash

Six weeks. That is what is left before the EUDR applies to large and medium companies on 30 December 2026.

There is no third delay on the table. So this is not the time for another webinar. It is the time to get one real filing through. Here is the plan, one week at a time.

At a glance:

  • 30 December 2026: large and medium operators and traders.
  • 30 June 2027: micro and small enterprises, with conditions.
  • 30 December 2027: products newly added to Annex I, such as soluble coffee.
  • The due diligence statement (DDS) must be in TRACES before the goods are placed on the market or exported.
  • Fines reach at least 4% of annual EU turnover.

Is the date final?

On current law, yes. After Regulation (EU) 2025/2650, the dates are 30 December 2026 and 30 June 2027. The Commission's review in May 2026 brought simplifications. It brought no new dates. On 12 November 2026, law firm Addleshaw Goddard called it the final countdown. If you want the full history, read the EUDR timeline and the latest updates.

Week 1: Confirm you are in scope

List every product you place on the EU market or export. Match each one to its CN code. Then check that code against Annex I as it stands now.

The list changed. Delegated Regulation (EU) 2026/2102 removed items such as cattle leather and some rubber goods. It added soluble coffee and certain palm oil derivatives, from 30 December 2027. A product that left the list needs no DDS. A product that joined gets one more year.

Then fix your role. The first company to place the goods on the EU market is the operator and files. Traders and downstream operators keep records but file nothing. Who files, and who only keeps records walks through it.

Week 2: Ask every supplier for the same five things

For each lot you need:

  1. The country of production.
  2. The geolocation of every plot.
  3. The date or period of production.
  4. Proof the land was not deforested after 31 December 2020.
  5. Proof it was produced legally in that country.

Send one template to every supplier. Same fields, same format. Set a reply date in week 3. Chase the silent ones from day two, not day ten.

Bindu does this part. Chasing suppliers is where most EUDR projects stall. Bindu's agents ask your suppliers for the missing fields over email or WhatsApp, collect the answers on one record per shipment, and flag what is still missing. Nobody chases by hand. You upload the shipment documents once. See how it works.

Week 3: Clean the geolocation

TRACES is strict about coordinates. The Commission's GeoJSON file description sets the rules:

  • Coordinates in WGS84, in decimal degrees, with at least six decimals.
  • One point is enough for a plot of up to 4 hectares. Larger plots need a polygon.
  • Polygons must be closed. No crossing lines, no holes, no figure-eight shapes.
  • Each DDS has a 25 MB file limit, GeoJSON included.

Run every supplier file through a GeoJSON check before you go near TRACES. A broken polygon found now costs minutes. Found at the border, it costs a week.

Week 4: Get into TRACES and practise

The EUDR Information System has two servers. ACCEPTANCE is for training and testing. PRODUCTION is the real one, where filings have legal value. The Commission notes that an account on one does not register you on the other. Register on both.

File one test DDS on ACCEPTANCE with a real lot. The Commission also runs free online training: the next session for operators is on 24 November 2026, at 14:00 CET. Our step-by-step guide shows how to submit a DDS in TRACES.

Week 5: Check the risk and close the gaps

Before you file, assess the risk for each lot. Country benchmark, supplier history, any satellite flags on the plots. Where the risk is not negligible, mitigate it: more documents, an audit, or a different supplier. Write down what you did. The record must be kept for five years.

Week 6: File, and brief customs

File the first real DDS on PRODUCTION. TRACES returns a reference number and a verification number. The reference number has to reach customs before release for free circulation or export. Tell your customs broker which declarations will carry it. Then pass both numbers to your buyers. What the DDS reference number does covers the chain.

If TRACES is down for more than 60 minutes, the authorities can issue a contingency reference number. It must be replaced with a system number once TRACES is back.

What to do this week

  1. Pull your product list and CN codes.
  2. Mark which products are operator filings and which are trader records.
  3. Send the five-field template to every supplier.
  4. Register on the TRACES ACCEPTANCE server.

Where Bindu fits. Bindu is built for small and mid-sized EU importers who need the EUDR done without an enterprise IT project. Upload the documents behind a shipment. Bindu collects what is missing from your suppliers, keeps the evidence on one record and files the DDS to TRACES. It costs from €249 a dossier, plus €20 a month for your workspace. No retainer. See how it works.

An aerial view of green trees and mountains in daylight.
Photo by Danny de Groot on Unsplash

FAQ

When does the EUDR apply? From 30 December 2026 for large and medium operators and traders. From 30 June 2027 for micro and small enterprises, under conditions.

Source: Commission: EUDR

Will the EUDR be delayed again? Not on current law. The May 2026 review brought simplifications and no new dates. Check again before the year ends.

Source: Commission: EUDR

Who files the due diligence statement? The operator: the first company to place the goods on the EU market or export them. Traders and downstream operators keep records instead.

Source: EUDR Information System FAQ

When do I need a polygon instead of a point? For plots larger than 4 hectares. Cattle are the exception: a point for the establishment is enough.

Source: EUDR Information System FAQ

What happens if TRACES is down on the day I ship? If the system is unavailable for more than 60 minutes, a competent or customs authority can issue a contingency reference number. It must later be replaced by a system number.

Source: EUDR Information System FAQ


This article reflects the official position as of 20 November 2026. We read the Commission's EUDR and Information System pages on that date. This is general information, not legal advice.